Connor Home Construction Projects

 
 

Epoxy and Walnut slab table

In the fall of 2019 I purchase a couple of Walnut slabs on Craig’s list. About 6 months later I completed the table. I had to build a water tight frame around the walnut and then pour the liquid epoxy in several pours of 1” at a time. Then lots and lots of sanding.

Remodeled Kitchen

As can be seen over the top of the walnut table the kitchen was finally remodeled. We want to rip out the formica dream kitchen since, before we moved in! After the flooded basement remodel, back patio addition, multiple bathrooms, windows, roof and sewer it was time. Fourteen years after moving in we started on the kitchen. The remodel meant new wood floors for the entire main level, moving plumbing, Ripping out dining room wall and Steel beam install.

Basement remodel

pictures coming soon